Release 5.1 Highlights
English |
Deutsch |
Italiano
From Loomdata Wiki
General
Basic data
- Parts list with support for Actual = Nominal. For this raw material no reservation or assignment must be done prior to the production.
Monitoring
- New Shift Editor application to delete ran, insert missing or correct wrong shifts.
- New MS7 Kernel software with user friendly interface.
- Shift planning supports now shift cycles with more than 255 days.
- Picanol Ethernet machines can be stopped by LOOMDATA now.
Item Management
- Allow editing of Q-Codes.
Production Order
- New planning report with planning proposal (by UserFun_MOrderProposal).
Reporting
- New powerful Item report.
- New Item Summary report.
- New Item Statistic report.
- New enhanced Weaving Statistic report.
- New powerful Article report in section Basic data.
- New Parts List report in section Basic data.
Weaving
- Support for up to 9 warp lines and 9 warp etages.
- New Yarn Consumption Report by date.
- New automatic adjusting of upper warps when main warp or order length have changed.
Inspection
- During cutting, new piece number is shown in the cut dialog instead of parent piece number.
- Optional a SAP Crystal Report Ticket can be printed at Running Q-Code (defect) end.
- Define position of a Q-Code (defect) by new buttons Left, Middle or Right.
- New field Comment added to Q-Code input dialog.